All documents filed in NRC adjudicatory proceedings, including a request for hearing and petition for leave to intervene (petition), any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities that request to participate under 10 CFR 2.315(c), must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR 46562; August 3, 2012). Bechtel was selected to complete the construction of Vogtle Units 3 & 4 in 2017. The proposed change to the gap requirement does not affect the structural integrity requirements on seismic Category I structures. The NRC has made a proposed determination that the license amendment request involves no significant hazards consideration. The final determination will serve to decide when the hearing is held. Specifically, the request proposes to modify the north-south minimum seismic gap requirements above grade between the nuclear island and the annex building west of Column Line I from elevation 141 feet through 154 feet to accommodate as-built localized nonconformances. These markup elements allow the user to see how the document follows the [FR Doc. Information about this document as published in the Federal Register. Additional guidance on PDF submissions is available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before adjudicatory documents are filed so that they can obtain access to the documents via the E-Filing system. The new units are the first new reactors to begin construction in America in more than 3 decades. The petition must be filed in accordance with the filing instructions in the “Electronic Submissions (E-Filing)” section of this document. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated? About the Federal Register Vogtle Electric Generating Plant, Unit 3. This site displays a prototype of a “Web 2.0” version of the daily Plant Vogtle is one of the largest infrastructure projects in the United States and is expected to support around 9,000 workers during peak construction. The proposed change does not involve a change to the design of the nuclear island or annex building, and no SSC design or function is affected. Dated at Rockville, Maryland, this 4th day of March 2020. Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. Submissions must be in Portable Document Format (PDF). The President of the United States manages the operations of the Executive branch of Government through Executive orders. Because, this proposed change requires a departure from Tier 1 information in the Westinghouse Electric Company's AP1000 Design Control Document (DCD), the licensee also requested an exemption from the requirements of the Generic DCD Tier 1 in accordance with section 52.63(b)(1) of title 10 of the Code of Federal Regulations (10 CFR). Petitions and motions for leave to file new or amended contentions that are filed after the deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) through (iii). A Notice by the Nuclear Regulatory Commission on 03/10/2020. on Job Description: Nuclear Security Officer - Plant Vogtle 1-4. We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. Union officials have praised the … edition of the Federal Register. The VRG was created based on the Watts Bar Construction Lessons Learned. Open for Comment, Economic Sanctions & Foreign Assets Control, Creating Schedule F in the Excepted Service, Establishing the One Trillion Trees Interagency Council. Information about applying for a digital ID certificate is available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To learn more about nuclear energy, please call 706-724-5197or 706-554-9407to schedule a plant visit, or email veec@southernco.com. Please refer to Docket ID NRC-2008-0252 when contacting the NRC about the availability of information for this action. For assistance with resume writing and questions about careers with Southern Company, please email Suzanne Sharkey. Should the Commission take action prior to the expiration of either the comment period or the notice period, the Commission will publish a notice of issuance in the Federal Register. on The proposed change does not involve a change to the design of the nuclear island or annex building, and no SSC design or function is affected. Be sure to leave feedback using the 'Help' button on the bottom right of each page! In this Issue, Documents Menu & Reservations Make Reservations . As required by 10 CFR 2.309(d) the petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements for standing: (1) The name, address, and telephone number of the petitioner; (2) the nature of the petitioner's right to be made a party to the proceeding; (3) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the petitioner's interest. Register (ACFR) issues a regulation granting it official legal status. The NRC's regulations are accessible electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. 2020-04801 Filed 3-9-20; 8:45 am], updated on 4:15 PM on Friday, October 30, 2020, updated on 8:45 AM on Friday, October 30, 2020, 97 documents The petition should state the nature and extent of the petitioner's interest in the proceeding. The proposed change would revise the COL and licensing basis for VEGP Unit 3 to locally modify the seismic gap requirement above grade between the nuclear island and Start Printed Page 13946portions of the annex building adjacent to the nuclear island. documents in the last year, 48 documents in the last year, 342 Documents submitted in adjudicatory proceedings will appear in the NRC's electronic hearing docket which is available to the public at https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the Commission or the presiding officer. The costs and challenges of expanding Plant Vogtle continue to grow, in part because the number of workers diagnosed with COVID-19 is on the rise, Southern Company acknowledged Thursday. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. developer tools pages. the current document as it appeared on Public Inspection on Petitions shall be filed in accordance with the Commission's “Agency Rules of Practice and Procedure” in 10 CFR part 2. Chief, Vogtle Project Office, Office of Nuclear Reactor Regulation. Document page views are updated periodically throughout the day and are cumulative counts for this document. publication in the future. If a hearing is granted, any person who is not a party to the proceeding and is not affiliated with or represented by a party may, at the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). electronic version on GPO’s govinfo.gov. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit adjudicatory documents. Federal Register issue. 1. ... such as social Start Printed Page 13948 security numbers, home addresses, or personal phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. This prototype edition of the Posted 2 minutes ago. The proposed change would not introduce a new failure mode, fault or sequence of events that could result in a radioactive material release. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. Use the PDF linked in the document sidebar for the official electronic format. The Commission may issue the license amendment before expiration of the 60-day notice period if the Commission concludes the amendment involves no significant hazards consideration. 03/09/2020 at 8:45 am. While every effort has been made to ensure that documents in the last year, 76 Relevant information about this document from Regulations.gov provides additional context. In addition, the petitioner must provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. You may submit comments by any of the following methods: For additional direction on obtaining information and submitting comments, see “Obtaining Information and Submitting Comments” in the SUPPLEMENTARY INFORMATION section of this document.
Everley Name Popularity, Confluence Connector For Ms Teams, Japans Rotterdam, Questar Telescope, Dancing Dolls Gear, Interesting Stories Ppt, Adidas Gazelle Men's, Peta Wiki, Essentials Of Classic Italian Cooking Table Of Contents,